19th Ave New York, NY 95822, USA

Our news

  • Day 3: BLOOM Innovation and Exploitation Strategy Workshop
    The third day in Barcelona was dedicated to the 1st BLOOM Innovation and Exploitation Strategy Workshop. The consortium reviewed the project’s innovation progress and Key Exploitable Results, discussed their maturity, dependencies and integration needs, and identified preliminary pathways for their future exploitation.The workshop also focused on business cases, target users and value propositions, intellectual property…
  • Day 2: BLOOM Pilot Demonstration
    Stay tuned for more insights on the BLOOM pilot plant! Learn more about our project
  • Day 2: BLOOM Pilot Demonstration
    The second day of the BLOOM Review Meeting moved from presentations to practice.At the project laboratory in Manresa, the consortium demonstrated the BLOOM containerised pilot system, including its main processing components, automation and control system.The live demonstration provided an opportunity to present the WP3 results, discuss the technical performance of the pilot and receive direct…
  • Day 1 of the BLOOM Review Meeting
    The first day focused on the progress achieved during Reporting Period 1.Partners presented updates on the project baseline and preliminary analysis, the modular MLA analysis system, the containerised pilot processing unit, communication and exploitation activities, as well as project coordination and management.Each session was followed by questions and discussion with the Project Officer and reviewers,…
  • BLOOM Consortium Review Meeting in Barcelona
    On 7–8 July 2026, the BLOOM consortium is meeting in Barcelona for the Reporting Period 1 Review Meeting. The 2 day programme brings together project partners, the Project Officer and external reviewers to assess progress, discuss the results achieved across the main work packages, and align the next steps for the project.The meeting combines strategic…
  • Advancing Critical Minerals Development: Taurus Infinity Contributions Featured at International Conference
    We are pleased to share that two papers related to Taurus Infinity LLC and Ta-Nb critical mineral projects are featured in the materials of the Tenth International Scientific-Practical Conference “Subsoil Use in Ukraine. Prospects for Investment”, held in Lviv, Ukraine, on 6–10 October 2025. The publications focus on two strategically important topics for Ukraine and…
  • Participation in the Conference
    Specialists from LLC Taurus Infinitydelivered presentations and reports at the 10th International Scientific and Practical Conference “Subsoil Use in Ukraine: Investment Prospects”, which took place in the city of Lviv on October 6–10, 2025. Their presentation focused on the involvement of the BLOOM consortium in the study of the Mostove project in Ukraine. Particular attention…
  • Next Phase — Data Processing and Future Collaboration
    Our team is currently focused on desktop processing of all collected data from the Mostove site. This includes building an updated database of technical and economic indicators for the deposit. This work will support the next stages of strategic planning and will be shared with our BLOOM partners to enhance joint decision-making. Together, we’re laying…
  • Our Contribution at the Mostove Deposit
    As part of the BLOOM project, TAURUS INFINITY LLC has completed a set of strategic activities at the Mostove deposit, including: ✅ Geodetic surveys for drilling planning✅ Drilling operations design and coordination✅ Development of laboratory procedures✅ Systematization of key technological data for complex ore analysis This phase provides the foundation for advanced evaluation and implementation…
  • We Are Part of the BLOOM Consortium
    TAURUS INFINITY LLC is proud to join the international BLOOM consortium — a global initiative that unites leading experts across industry and research. The BLOOM consortium brings together 14 partners from four European countries, two from Ukraine, three from Canada, and one from Brazil — one of the most resource-rich countries in the world. We…
  • Planned inspection
    From 22 November to 3 December a regular inspection of compliance with legislative requirements in the sphere of geological study and rational use of natural resources by Taurus Infinite LLС was carried out by the annual plan of state supervision activities of the State Service of Geology and Subsoil of Ukraine.During the inspection, the Taurus…
  • Memorandum of understanding signed by Taurus Infinity LLC and NioCorp Developments Ltd.
    Memorandum of understanding signed by Taurus Infinity LLC and NioCorp Developments Ltd. on May 19, 2021.
  • The project for a detailed geological and economic assessment are approved by Minutes
    The project for a detailed geological and economic assessment of tantalum ores at Mostove area (ore zone 3) in the Kirovograd region, approved by Minutes No. 02/21 dated April 20, 2021 at the joint meeting of Geological Service Company LLC and Taurus Infinity LLC.
  • Form 3-gr dated March 31, 2021, for works of the detailed geological and economic assessment
    Form 3-гр dated March 31, 2021, for works of the detailed geological and economic assessment of the Mostove deposit (ore zone 3) was registered, State registration number of the object У-21-82/1.
  • Based on the model, we developed a drilling program coordinated with the American company NioCorp Developments Ltd.
    Based on the model, we developed a drilling program coordinated with the American company NioCorp Developments Ltd. To assess the parameters of Mostove site, it is planned to drill 9 deep inclined drill holes (2,350 m), which should be drilled in four profiles oriented across the dip of potential ore zones. The distance between the…
  • We created a 3D model of the deposit in Micromine software
    Based on the available information we created a 3D model of the deposit in Micromine software. Information received according to the contract 148/18 with SRDE “Geoinform of Ukraine”.The wireframe was created on the basis of ore intervals. Delineation of ore bodies was carried out by cut off grade of 0.004% Ta2O5. A total of 17…
  • In 2020 the archives of geological information and database of the Mostove
    In 2020 the archives of geological information and database of the Mostove deposit (ore zone 3) were compiled. The database consists of four main files (Collar, Inclination, Geology, Assay). Collar – includes main information about drill holes, including coordinates. Inclination – drill hole surveying file. Geology – the file of the geological logging of the…
  • Received special permit for tantalum ore mining at Mostove deposit
    Special permit for tantalum ore mining at Mostove deposit (ore zone 3) №6372 dated September 25, 2019, was received.