The unique properties of tantalum and niobium determine a stable and reliable demand now and in the future. Modern industry is significantly interested in using these elements.
Project indicators
Economic efficiency
In 2019, Taurus Infiniti LLC carried out a preliminary geological and economic assessment of the ore occurrence Mostove. As a result, reserves of category C2 and resources of category P1were approved in the State Service of Geology and Subsoil of Ukraine
TANTALUM ORE RESOURCES OF THE MOSTOVE DEPOSIT
Class
Category
Tonnage, tt
Ta2O5, %
Resources Ta2O5, t
Nb2O5, %
Resources Nb2O5, t
222
C2
350.8
0.01030
36.1
0.00659
24.4
333
P1
4384.3
0.02153
755.1
0.01101
386.1
222+333
C2+P1
4735.1
0.0208
796.1
0.01076
413.0
334
P2
1556.5
0.02061
200.9
200.9
104.2
222+333+334
C2+P1P2
6291.6
0.02075
997.0
0.01074
517.2
As a result of the technical and economical report preparation, the sufficient attractiveness of the project according to standard indicators of investment projects is shown.
GENERALIZED TECHNICAL AND ECONOMIC INDICATORS
#
Indicator’s name
Values (annual or total)
1
Balance reserves, thousand tons
350.791
2
Annual ore production, thousand tons
70
3
Lifetime, years
7
4
Capital investment, $ million
5.89
5
Concentrate price, $/t
89.43
6
Net cash flow, million $
3.61
7
Profitability index
1.07
8
РВР – payback period, years
5
Prospects for increasing the resource base
There are two more mineralization zones at the Mostove project, whose reserves have been previously estimated. Vys’ and Kopanky mineral occurrences are located 2 km north-north-west and 1.5 km south-west. The prospective Ta2O5 and Nb2O5 resources of Р2 category were estimated.
They can be considered as an increase in the resource base.
INCREASE IN THE RESOURCE BASE
Objects
Category
Ta2O5 resources, t
Nb2O5resources, t
Mineralization zone 1 of Mostove project
P2
107,7
126,32
Mineralization zone 2 of Mostove project
P2
147,2
283,36
Vys’ mineral occurrence
P2
871,5
1098,3
Kopanky mineral occurrence
P2
576,0
661,1
1702,4
2169,08
Proceeding from the above our resource base can be increased by: